WBSP364: Grow Your Business by Learning the Best Practices of Shop Floor Scheduling, a Live Interview w/ a Panel of Experts

1:03:54
 
공유
 

Manage episode 337406300 series 2839167
Player FM과 저희 커뮤니티의 Sam Gupta 콘텐츠는 모두 원 저작자에게 속하며 Player FM이 아닌 작가가 저작권을 갖습니다. 오디오는 해당 서버에서 직접 스트리밍 됩니다. 구독 버튼을 눌러 Player FM에서 업데이트 현황을 확인하세요. 혹은 다른 팟캐스트 앱에서 URL을 불러오세요.

Shop floor scheduling is always the hottest debate in the ERP community. In fact, it is so complex that most SMB companies end up managing their scheduling on spreadsheets. Also, the problems are much worse when multiple systems might be involved in the architecture. They each might claim how inadequate the other system is. With no clear consensus on what works when it comes to scheduling. One of the problems often discussed on the root causes of scheduling is the number of exceptions that the shop floor has to manage. And the ever-changing nature of the schedule. So can you ever fully automate shop floor scheduling? Or would it always require manual interventions? And if scheduling is this hard, how do larger companies manage their plants where the schedule of one plant may impact the other.

In today's episode, we invited a panel of cross-functional experts for a live interview on LinkedIn who brings significant expertise to discuss shop floor scheduling best practices. We discussed scheduling issues for different industries and product categories. Finally, we discussed several stories related to scheduling where we discussed concepts such as how WIP could impact scheduling, why material availability is equally important, and how multiple streams affect shop floor scheduling.

For more information on growth strategies for SMBs using ERP and digital transformation, visit our community at wbs.rocks or elevatiq.com. To ensure that you never miss an episode of the WBS podcast, subscribe on your favorite podcasting platform.

427 에피소드