Player FM 앱으로 오프라인으로 전환하세요!
200 Closing Statements on testing and regulation
Manage episode 332510311 series 2301009
This week the inquiry heard closing statements for Module 6, outlining how combustible materials came to be tested, certified and regulated and ended up being installed on the outside walls of Grenfell Tower. Lawyers representing the Bereaved, Survivors and Residents said the Inquiry had exposed fault-lines in the “edifice of government” and another said the “seeds of the Grenfell Tower fire were sown 20 years earlier”. There was criticism of manufacturers, regulators, building control bodies and of the government, with barristers accusing a “cabal of ministers” of being “enslaved to the deregulatory agenda”. Presenter: Kate Lamble Producers: Sharon Hemans and Kristiina Cooper Researcher: Marcia Veiga Sound Engineer: Gareth Jones Editor: Hugh Levinson
219 에피소드
Manage episode 332510311 series 2301009
This week the inquiry heard closing statements for Module 6, outlining how combustible materials came to be tested, certified and regulated and ended up being installed on the outside walls of Grenfell Tower. Lawyers representing the Bereaved, Survivors and Residents said the Inquiry had exposed fault-lines in the “edifice of government” and another said the “seeds of the Grenfell Tower fire were sown 20 years earlier”. There was criticism of manufacturers, regulators, building control bodies and of the government, with barristers accusing a “cabal of ministers” of being “enslaved to the deregulatory agenda”. Presenter: Kate Lamble Producers: Sharon Hemans and Kristiina Cooper Researcher: Marcia Veiga Sound Engineer: Gareth Jones Editor: Hugh Levinson
219 에피소드
ทุกตอน
×플레이어 FM에 오신것을 환영합니다!
플레이어 FM은 웹에서 고품질 팟캐스트를 검색하여 지금 바로 즐길 수 있도록 합니다. 최고의 팟캐스트 앱이며 Android, iPhone 및 웹에서도 작동합니다. 장치 간 구독 동기화를 위해 가입하세요.