Player FM 앱으로 오프라인으로 전환하세요!
308: Israel Prime Minister in Washington D.C - Will Address Joint Session of Congress + Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024 + US Army Reports 6 Month Schedule Delay in JLTV Production + More
Manage episode 430352410 series 3336185
For review:
1. Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024.
Royal Australian Navy destroyer HMAS Sydney (DDG-42) successfully fired a Naval Strike Missile and sank former amphibious assault ship USS Tarawa (LHA-1) in the waters off Hawaii during the biennial Rim of the Pacific 2024 exercise.
2. China & Philippines open a direct line of communication between respective presidential offices to prevent escalation of events during territorial disputes in the South China Sea.
3. Israel Prime Minister in Washington D.C. (Monday).
PM Netanyahu will address a joint session of the US Congress on Wednesday and will meet with President Joe Biden in the White House on Thursday.
4. At Farnborough Air Show, Global Combat Air Programme (GCAP) partners (Italy, Japan, & UK), unveil a concept of the future crewed fighter. The concept design is a delta wing shape, with increased wingspan ,compared to previous iterations.
5. At Farnborough, USAF Secretary comments on the Next-Generation Air Dominance (NGAD) fighter program.
6. US releases Arctic Strategy document: 2024 National Strategy for the Arctic Region.
7. US Army Reports 6 Month Schedule Delay in JLTV Production.
According to PEO Combat Support & Combat Systems Support Spokesperson: AM General’s initial delivery of Joint Light Tactical Vehicles (JLTVs), has been delayed by six months- due to challenges starting up a new production line.
329 에피소드
Manage episode 430352410 series 3336185
For review:
1. Royal Australian Navy Destroyer Employs Naval Strike Missile at RIMPAC 2024.
Royal Australian Navy destroyer HMAS Sydney (DDG-42) successfully fired a Naval Strike Missile and sank former amphibious assault ship USS Tarawa (LHA-1) in the waters off Hawaii during the biennial Rim of the Pacific 2024 exercise.
2. China & Philippines open a direct line of communication between respective presidential offices to prevent escalation of events during territorial disputes in the South China Sea.
3. Israel Prime Minister in Washington D.C. (Monday).
PM Netanyahu will address a joint session of the US Congress on Wednesday and will meet with President Joe Biden in the White House on Thursday.
4. At Farnborough Air Show, Global Combat Air Programme (GCAP) partners (Italy, Japan, & UK), unveil a concept of the future crewed fighter. The concept design is a delta wing shape, with increased wingspan ,compared to previous iterations.
5. At Farnborough, USAF Secretary comments on the Next-Generation Air Dominance (NGAD) fighter program.
6. US releases Arctic Strategy document: 2024 National Strategy for the Arctic Region.
7. US Army Reports 6 Month Schedule Delay in JLTV Production.
According to PEO Combat Support & Combat Systems Support Spokesperson: AM General’s initial delivery of Joint Light Tactical Vehicles (JLTVs), has been delayed by six months- due to challenges starting up a new production line.
329 에피소드
Semua episod
×플레이어 FM에 오신것을 환영합니다!
플레이어 FM은 웹에서 고품질 팟캐스트를 검색하여 지금 바로 즐길 수 있도록 합니다. 최고의 팟캐스트 앱이며 Android, iPhone 및 웹에서도 작동합니다. 장치 간 구독 동기화를 위해 가입하세요.